® Delivery of Equipment for Lifting and Installation of a Diesel Heater 75 T

“MP – METALPLAST” JSC is Bulgarian company with 30 years of experience in the field of design, manufacturing, and repair of steel structures, machines, installations, equipment, and spare parts for mining, enrichment, and metallurgical industries.
The company trusted Kammarton Bulgaria for the delivery of equipment for lifting and installation of a 75 T diesel heater. The delivery includes two sectional beams of 110 tons with a length of 4 meters from the Spanish company OX WORLDWIDE.

  • Manufactured in accordance with current standards for lifting equipment.
  • Reduced size and weight, which facilitates and reduces costs of transport, storage and installation.
  • Easy and quick assembly by following the steps in the instruction manual.

The manufacturer complies with the provisions of the directives of the European Parliament and of the Council 2006/42 / EC of May 17, 2006 and 2014/30 / UE of February 26, 2014. The product is manufactured in accordance with the following norms:

  • UNE-EN ISO 12100: 2012
  • UNE-EN 13155:2004+A2:2009
  • UNE-EN ISO 3834-2:2006
  • DNV GL standard DNVGL-ST-0378
  • DNV GL standard DNVGL-ST-0377

KAMMARTON BULGARIA prepares individual solutions according to the needs and requirements of the client for any lifting that needs to be carried out.